Moderadores: Lepanto, poliorcetes, Edu, Orel
Augur escribió:Previsto el lanzamiento del Miura 1 para esta madrugada a las 02:00
https://x.com/PLD_Space/status/17100499 ... muEpQ&s=09
Para seguirlo desde una hora antes:
https://www.youtube.com/live/jszhirm1CG0?feature=shared
Augur escribió:Hoy a las 02:19 ha salido el Miura 1 disparado como un cohete sin ninguna incidencia.
Enhorabuena a PLD Space!!
Xoancar escribió:Augur escribió:Previsto el lanzamiento del Miura 1 para esta madrugada a las 02:00
https://x.com/PLD_Space/status/17100499 ... muEpQ&s=09
Para seguirlo desde una hora antes:
https://www.youtube.com/live/jszhirm1CG0?feature=shared
A ver si va la vencida. Parece poca cosa pero para una país como España, que haya una empresa privada que haga algo parecido me parecía hasta no hace mucho impensable
...
La contraprestación o retorno operativo para el MINISDEF, gestionado a través del EA, se establece en una cantidad equivalente al 15% de las imágenes anuales del telescopio instalado en el EVA núm. 21. Dicho retorno podrá proceder de las imágenes de dicho telescopio o de cualquiera otra propiedad propiedad de Deimos que pueda satisfacer las necesidades del EA.
La capacidad media del telescopio instalado se estima en 5000 imágenes por noche de funcionamiento, por lo que la media del volumen de imágenes a disposición del MINISDEF no será inferior a 750 por noche de funcionamiento. Las noches en funcionamiento por año se estiman en un 65% del total anual, por descontarse las correspondientes a inclemencias meteorológicas, luna llena, mantenimiento o averías (para garantizar el cumplimiento de la contraprestación, Deimos compartirá con el MINISDEF, a través del EA, un registro diario de disponibilidad del telescopio).
El retorno establecido podrá incrementarse, previo acuerdo por escrito, en función de la experiencia adquirida por el personal del EA durante la vigencia del convenio.
...
...
The objective of the Satellite Control Network Tracking Station Operations, Remote Site and Mission Partner Support (STORMS) IDIQ Contract is to provide operations, remote site and mission partner support, training and organizational maintenance for the Satellite Control Network (SCN). The mission of the SCN is to provide, through telemetry, tracking, commanding and payload (TTC&P), assured access to space systems and to distribute space system information in support of operational Department of Defense (DoD) missions, National Security, Research, Development Test & Evaluation (RDT&E) programs, and other designated users.
The SCN is continually evolving to meet the USSF objectives for commonality, interoperability, survivability, capacity, and responsiveness for control of space systems in accordance with (IAW) USSF policy. The space programs supported by the SCN are of vital interest to the nation and require continuous support. The effort put forth under this contract by the contractor should, at all times reflect the relationship between the SCN and the safety and security of the United States (US) and its Allies.
The SCN is a global network of Radio Frequency (RF) antennas, complex signal processing and routing communications equipment and computer systems that support a growing inventory of increasingly complex space vehicles which support operational forces in peace and wartime. It is designed to have the flexibility to support a wide spectrum of orbiting satellites. A large number of satellites with various altitudes and orbit inclinations are supported on a 24-hour per day, 7-day a week, 365 days a year (24/7/365) continuous schedule. In addition to the primary support provided to the DoD and its mission partners, the SCN also provides services for approved non-DoD organizations.
...
The STORMS IDIQ shall have a five (5) year base plus one (1) five (5) year option totaling a ten (10) year ordering period from contract award . Performance of TOs shall not exceed one (1) year past the end date of the established ordering period. The IDIQ will have a ceiling of $480M and a Task Order minimum guarantee is $100K.
The first TO is contemplated to have a sixty (60) day phase-in, a base of twelve (12) months, four (4) one (1) year option periods, and a six (6) month extension of services option.
nnn
yasiw escribió:Respecto a la gran noticia de PDL Space y el exitoso lanzamiento del Miura 1, 2 apuntes:
1. Yo que he seguido con bastante interés las evoluciones de la empresa todos estos meses, no me deja de sorprender cómo desde la administración central han salido distintas voces a aplaudir y sumarse al éxito de la prueba. Bien por ellos, pero hasta ahora no se les había visto el pelo... Y ahora se presume de que el 30% del presupuesto ha sido facilitado por la administración (qué menos).
2. Lamentablemente, el éxito no ha sido total pues es oficial que no han podido recuperar el aparato en el océano:
https://actualidadaeroespacial.com/pld-space-no-consiguio-recuperar-el-miura-1-tras-su-amerizaje-en-el-atlantico/
Enviado desde mi SM-A715F mediante Tapatalk
Usuarios navegando por este Foro: No hay usuarios registrados visitando el Foro y 0 invitados